• 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
7000 sq. fts. How long does it take ???
#23
For a rotary machine or Cimex, the showerfeed system is unbeatable. The showerfeed provides better control on the fly.

On a CRB machine or on an OP machine a spray system is a matter of necessity., due to the function of the machines.

So it really depends on the type of machine that you're using.
  Reply


Messages In This Thread
RE: 7000 sq. fts. How long does it take ??? - by encapman - 09-09-2015, 05:56 PM



Users browsing this thread: 4 Guest(s)