I am cleaning 17000 sq feet of concrete this week and want some advice.
things to know
concrete is not that dirty , well not crazy dirty
its pretty much wide open space.
when i first got this job i looked into buying a scrubbing machine but then i thought ok this is most likely a one time deal, so i thought i have a cimex and a 175 and a huge walk behind shop vac. I also have 2 young men helping me so here is what i thought.
one will put product down with the cimex or 175 and the other will walk behind with the walk behind shop vac.
what do you think ?
also what product ?
what brushes or pads ?
how long do think it would take.
i have about a total of 16 hours do get this done ...
thanks
John
I am cleaning 17000 sq feet of concrete this week and want some advice.
things to know
concrete is not that dirty , well not crazy dirty
its pretty much wide open space.
when i first got this job i looked into buying a scrubbing machine but then i thought ok this is most likely a one time deal, so i thought i have a cimex and a 175 and a huge walk behind shop vac. I also have 2 young men helping me so here is what i thought.
one will put product down with the cimex or 175 and the other will walk behind with the walk behind shop vac.
what do you think ?
also what product ?
what brushes or pads ?
how long do think it would take.
i have about a total of 16 hours do get this done ...
thanks